General Terms and Conditions (AGB) of A+S GmbH
Version: 07.08.2025
Part A: General provisions for all customers
§ 1 Scope and basis of the contract
These General Terms and Conditions apply to all contracts for services and trade work between A + S GmbH (contractor, Auftragnehmer) and the customer (client, Auftraggeber).
The basis of the contract is, in the following order:
- a) The quote signed by the client or the individual contract for work and services (Werkvertrag).
- b) Any specifications of work and technical documents attached to the quote.
- c) The special provisions for consumers (Part B) or for businesses (Part C) of these General Terms and Conditions.
- d) The general provisions of these General Terms and Conditions (Part A).
- e) The statutory provisions.
Conflicting or deviating terms of the client do not become part of the contract unless the contractor expressly agrees to their validity in writing.
§ 2 Quote and conclusion of the contract
The contractor’s quotes are subject to change (freibleibend). The contractor is bound by an individually prepared quote for the period stated in the quote, otherwise for 14 calendar days.
The contract is concluded when the client accepts the quote.
The contractor reserves ownership rights and copyrights to all quote documents, drawings and calculations.
§ 3 Prices and terms of payment
The prices agreed in the quote or contract apply. The period for which prices are fixed can be found in the quote.
All prices are subject to the applicable statutory value added tax (Umsatzsteuer).
The due dates of instalment payments and final payments are governed by the individual agreement in the quote or contract.
In the event of late payment, the contractor is entitled to suspend work until payment is received and to claim default interest at the statutory rate.
§ 4 Changes to the work
If the client wishes to change the agreed work, the contractor will examine the effects on price and schedule and submit a supplementary quote (Nachtragsangebot). The work will only be carried out after the supplement has been accepted in writing or verbally.
The contractor is entitled to make changes that are technically necessary or serve progress, provided that these are reasonable for the client and do not lead to a reduction in value.
§ 5 Client’s duties to cooperate (Mitwirkungspflichten)
The client ensures that the work can be carried out without hindrance. This includes in particular providing a clear place of work and the necessary utility connections (electricity, water). The client bears the consumption costs.
If the contractor incurs waiting times or additional work due to the client’s failure to meet its duties to cooperate, the contractor is entitled to invoice these separately.
§ 6 Coordination and authority to act
The client grants the contractor the authority to coordinate that is required for efficient and professional project execution. In doing so, the contractor always acts in the best possible interest of the project and the client.
This includes in particular coordination with other trades and accepting deliveries. Fundamental decisions that go beyond the contractual framework always require prior agreement with the client.
§ 7 Acceptance (Abnahme)
After completion of the work, the client is obliged to accept it. The contractor may also demand acceptance of self-contained parts of the work.
At the request of either party, a record of the acceptance will be drawn up. Insignificant defects do not entitle the client to refuse acceptance.
§ 8 Liability
The contractor’s liability is excluded, except for damage resulting from injury to life, body or health, and for other damage based on an intentional or grossly negligent breach of duty.
In the event of a slightly negligent breach of essential contractual obligations (cardinal obligations, Kardinalpflichten), liability is limited to the foreseeable damage typical for this type of contract.
§ 9 Retention of title (Eigentumsvorbehalt)
All materials supplied remain the property of the contractor until all claims arising from the business relationship have been paid in full.
Part B: Special provisions for consumers (§ 13 German Civil Code, BGB)
§ 10 Applicability
The following provisions apply exclusively to clients who are consumers. They supplement or replace the provisions of Part A.
§ 11 Warranty (claims for defects, Gewährleistung / Mängelansprüche)
The warranty period is 5 years for buildings and 2 years for other work, starting from acceptance.
In the event of a defect, the client has the right to choose the type of subsequent performance (Nacherfüllung: remedying the defect or producing the work anew). The contractor may refuse the chosen type if it is only possible at disproportionate cost.
Duty to advise and execution at the client’s request: The contractor undertakes to carry out the work in accordance with the generally accepted rules of technology (anerkannte Regeln der Technik) and its own quality standards. If the client requests an execution that deviates from these standards, the contractor will inform the client in text form of the associated technical risks (e.g. for durability, safety or functionality) (notice of concerns, Bedenkenanmeldung).
- a) The contractor is entitled to refuse such an execution if it endangers safety or contradicts fundamental technical standards.
- b) If, after this notice, the client nevertheless insists on the requested execution, it can only be carried out on the basis of a separate written agreement. This agreement will record that the client assumes full responsibility and liability for all defects and consequential damage resulting from the type of execution instructed by the client.
If subsequent performance fails, the client is entitled to the further statutory rights (reduction of the price, withdrawal from the contract, damages).
§ 12 Acceptance
While the work is being carried out, the client may report defects at any time. The warranty period begins once acceptance has taken place. Deemed acceptance (fiktive Abnahme) only occurs under the statutory conditions of § 640 (2) BGB.
Part C: Special provisions for businesses (§ 14 German Civil Code, BGB)
§ 13 Applicability
The following provisions apply exclusively to clients who are businesses (Unternehmer). They supplement or replace the provisions of Part A.
§ 14 Warranty (claims for defects)
The warranty period is 5 years for buildings and 1 year for all other work and repairs, starting from acceptance.
In the event of a defect, the contractor chooses the type of subsequent performance (remedying the defect or producing the work anew).
If the type of subsequent performance requested by the client is based on a technically or economically unsuitable decision, even though the contractor has pointed this out in writing, the contractor may refuse to carry it out. If the client nevertheless insists on its choice, liability for resulting consequential damage passes to the client, provided this is recorded in a separate agreement.
§ 15 Duty to inspect and give notice of defects (Untersuchungs- und Rügepflicht)
The client must inspect the work without undue delay after completion and report obvious defects in writing without undue delay, but no later than within 7 working days. Hidden defects must be reported without undue delay after they are discovered. If this duty is breached, the work is deemed to have been approved.
§ 16 Place of jurisdiction and framework agreement
The place of performance and exclusive place of jurisdiction for all disputes is the contractor’s registered office.
These General Terms and Conditions also apply as a framework agreement to all future contracts with the same client, without the need for a renewed reference to them.
§ 17 Final provisions
Should individual provisions be invalid, the validity of the remaining provisions remains unaffected. The parties undertake to replace the invalid provision with a provision that comes closest to what was economically intended.